BOSS Tiny House

BOSS Tiny House
May 18, 2020 Charly Ligety

BOSS Tiny House

Based in Los Angeles, California, BOSS Tiny House is a division of US Polymers, Inc. The company operates globally with a team spread worldwide and sales of over 100,000 kits across the U.S. and other parts of the world. It is also a top innovator in the tiny house space with several patents under its belt for advanced technologies in its designs.

Complete modular cabins with durable steel structure and insulated walls/roof. Comes with Electrical and lighting system and optional Plumbing. Can be delivered assembled or ready to build on site as a kit. Partition wall included to separate rooms or for bathroom.

  • Concept Owner / Company: US Polymers
  • Website: www.bosstinyhouse.com
  • Additional URL:
  • Contact: sales@uspolymersinc.com
  • Quoted Total Cost: $9,995
  • Quote’s Total Interior Square Footage: 170 sqft
  • Quote Sleeps # People/Beds: 2 beds
  • Quote Includes # Units: 1 units
  • In Stock / Ready to Ship Today: Yes

Design

Used for shelter before? Yes
Used for shelter in the U.S.? Yes
If so, list examples
Prior use comments
Building experience comments
Intended use cases
R-value (insulation) 0-10
Risk Category
Roof Load (PSF) 30
Indoor Clearance Height (ft) 10
Waterproof? Yes
Professional Engineer Stamp? wet stamped CA structural engineer
Conforms to ICC’s Temporary Structure and Uses Code yes
Other Structural/Safety Comments structurally sound with CA engineer wetstamp
Sustainability/Green Building Certifications?
Materials Used/Made of: steel exterior, Vinyl coated interior, insulated panels
Mobile? [mobile]
Disassembly/Assembly Comments: yes
Ideal Mounting Surfaces Soil (Dirt/Grass), Asphalt / Parking Lot, Other
Anchoring Process can be anchored with bolts

Budget

Item Cost ($) Notes
Materials $9995 basic unit 8.5’x20′
Labor $8000 assembly
Delivery $
$
$
$ 967: San Juan Capistrano
Budget Total $17995
Total Per Bed $8998
Total Per Unit $17995
Add-on Items
Check all items that are not included in your quote (i.e. would need to be quoted by outside party) Foundation work, HVAC, Toilet / Washrooms, Delivery Charge
List outside vendors needed to execute (including any architects and engineers)
Possible Delivery Method(s)
% of Housing Built On-site [built_onsite]
Installation Special Tooling / Skill Level [skill_level]

Timing

Earliest On-site Opening Date [earliest_date]
Design (days) 1
Production (days) 4
Site Prep (days) 4
Delivery (days) 1
Total (days) 10
Amount in Inventory (#) 24
Production Capacity 1000
Production Location
< Prev
Next >