Model A A-Fold House
A-Fold Houses
Foldable A-frame structures setup within 3 days on-site
Nearly Ready (Prior Use Cases)
$171,000
3 residents / 2 bedrooms
$57,000 / resident
Long-Term/Permanent (15+ years)
25 days offsite | 3 days onsite |
A-Fold Houses are foldable A frame structures that can we setup within 3 days. The folding technique allows the home to be build and inspected in the factory to keep cost and build times low.
- Quoted Total Cost: $171,000
- Planned Occupancy (1 person/bed): 3 beds
- Estimated Cost Per Bed: $57,000
- Quote’s Total Interior Square Footage: 750 sqft
- Quote Includes # Units: 1 unit
- Used for Shelter Before: Yes, but only outside the U.S.
- Readiness: Nearly Ready (Prior Use Cases)
- In Stock / Ready to Ship Today: No
- Manufacturer Identified and Available: N/A
- Setup Speed: <90 Days
- Setup Difficulty: Moderate (prefab assembly)
- % Built Onsite: <10% – Arrives Ready, Almost All Built/Assembled Off-Site
- Portability: Portable (after major disassembly)
- Intended Use of Shelter: Long Term/Permanent (15+ years)
Design Advantages | Foldable 2 story house. 2 day setup, all inspections done in factory. |
Manufacturer Identified | Yes |
Used for shelter in the U.S.? | No, first prototype for U.S. approval currently under construction |
Prior use examples | 40 units have been ordered and 15 units have been installed so far (Europe only). |
Prior use comments | |
Building experience comments | |
Intended use cases | |
R-value (insulation) | |
Risk Category | |
Roof Load (PSF) | 0 |
Indoor Clearance Height (ft) | |
Waterproof? | |
Professional Engineer Stamp? | |
Conforms to ICC’s Temporary Structure and Uses Code | |
Other Structural / Safety Comments | |
Sustainability / Green Building Certifications? | |
Materials Used / Made of: | |
Disassembly / Assembly Comments: | |
Ideal Mounting Surfaces | |
Anchoring Process |
Item | Cost ($) | Notes |
Materials | $ | |
Labor | $ | |
Delivery | $ | |
$ | ||
$ | ||
$ | ||
Budget Total | $0 | |
Total Per Bed | $0 | |
Total Per Unit | $0 | |
Add-on Items | ||
Check all items that are not included in your quote (i.e. would need to be quoted by outside party) | ||
List outside vendors needed to execute (including any architects and engineers) | ||
Possible Delivery Method(s) |
Design (days) | |
Production (days) | |
Site Prep (days) | |
Delivery (days) | |
Total (days) | 0 |
Amount in Inventory (#) | |
Production Capacity | |
Production Location |