treehouse
Gravity Architects
A rapid housing solution for everyone in any situation, using structurally insulated panels and sustainable bamboo exterior cladding, and designed to meet full ADA accessibility requirements
Conceptual Idea Only
$135,850
2 residents / 1 bedroom
$67,925 / resident
Long-Term/Permanent (15+ years)
60 days offsite | 30 days onsite |
Partially factory-built OSB SIP (oriented strand board structural insulated panel) getaway cabin. This 1 bedroom unit makes use of 1-3lb EPS insulating foam at its wall core, sandwiched between two structural OSB skins. The v2 treehouse features a site-built wood-framed patio & observation deck to gaze at the stars.
As tested by the U.S. Department of Energy, SIPs have been proven to outperform conventional frame construction by at least 66% for energy efficiency, & can be up to 2.5 times stronger than conventional framing, while reducing the framing time by over 50% with superior noise and weather isolation.
- Quoted Total Cost: $135,850
- Planned Occupancy (1 person/bed): 2 beds
- Estimated Cost Per Bed: $67,925
- Quote’s Total Interior Square Footage: 340 sqft
- Quote Includes # Units: 1 unit
- Used for Shelter Before: Not used as shelter yet
- Readiness: Conceptual Idea Only
- In Stock / Ready to Ship Today: No
- Manufacturer Identified and Available: N/A
- Setup Speed: <90 days (when prototype completed)
- Setup Difficulty: Moderate (prefab assembly)
- % Built Onsite: 50% – Some Prefab Parts Assembled On-Site/Flat Pack
- Portability: Portable (after major disassembly)
- Intended Use of Shelter: Long Term/Permanent (15+ years)
Design Advantages | |
Manufacturer Identified | |
Used for shelter in the U.S.? | No |
Prior use examples | |
Prior use comments | |
Building experience comments | |
Intended use cases | |
R-value (insulation) | |
Risk Category | |
Roof Load (PSF) | 0 |
Indoor Clearance Height (ft) | |
Waterproof? | |
Professional Engineer Stamp? | |
Conforms to ICC’s Temporary Structure and Uses Code | |
Other Structural / Safety Comments | |
Sustainability / Green Building Certifications? | |
Materials Used / Made of: | |
Disassembly / Assembly Comments: | |
Ideal Mounting Surfaces | |
Anchoring Process |
Item | Cost ($) | Notes |
Materials | $ | |
Labor | $ | |
Delivery | $ | |
$ | ||
$ | ||
$ | ||
Budget Total | $0 | |
Total Per Bed | $0 | |
Total Per Unit | $0 | |
Add-on Items | ||
Check all items that are not included in your quote (i.e. would need to be quoted by outside party) | ||
List outside vendors needed to execute (including any architects and engineers) | ||
Possible Delivery Method(s) |
Design (days) | |
Production (days) | |
Site Prep (days) | |
Delivery (days) | |
Total (days) | 0 |
Amount in Inventory (#) | |
Production Capacity | |
Production Location |