Flatpack 2-Story Structure
AMC Box
Flat pack 143-square foot unit stackable up to 3-stories, assembled on-site in one day.
Ready (In Stock)
$3,300
4 residents / 1 unit
$825 / resident
Long-Term/Permanent (15+ years)
28 days offsite | 1 days onsite |
Flat pack unit is the most popular modular in affordable structure. The roof and floor are prefabricated at factory, easy installation of the frames on site according to our instructions. It can be designed with different functions like bathroom, shower, kitchen, bedroom, offices, etc. Please follow us with more details.
- Quoted Total Cost: $3,300
- Planned Occupancy (1 person/bed): 4 beds
- Estimated Cost Per Bed: $825
- Quote’s Total Interior Square Footage: 142.6 sqft
- Quote Includes # Units: 1 unit
- Used for Shelter Before: Yes, but only outside the U.S.
- Readiness: Ready (In Stock)
- In Stock / Ready to Ship Today: Yes
- Manufacturer Identified and Available: N/A
- Setup Speed: 1 day on-site assembly
- Setup Difficulty: Moderate (prefab assembly)
- % Built Onsite: 50% – Some Prefab Parts Assembled On-Site/Flat Pack
- Portability: Portable (after major disassembly)
- Intended Use of Shelter: Long Term/Permanent (15+ years)
Design Advantages | |
Manufacturer Identified | |
Used for shelter in the U.S.? | No |
Prior use examples | China hospital and office applications |
Prior use comments | |
Building experience comments | |
Intended use cases | |
R-value (insulation) | |
Risk Category | |
Roof Load (PSF) | 0 |
Indoor Clearance Height (ft) | |
Waterproof? | |
Professional Engineer Stamp? | |
Conforms to ICC’s Temporary Structure and Uses Code | |
Other Structural / Safety Comments | |
Sustainability / Green Building Certifications? | |
Materials Used / Made of: | |
Disassembly / Assembly Comments: | |
Ideal Mounting Surfaces | |
Anchoring Process |
Item | Cost ($) | Notes |
Materials | $ | |
Labor | $ | |
Delivery | $ | |
$ | ||
$ | ||
$ | ||
Budget Total | $0 | |
Total Per Bed | $0 | |
Total Per Unit | $0 | |
Add-on Items | ||
Check all items that are not included in your quote (i.e. would need to be quoted by outside party) | ||
List outside vendors needed to execute (including any architects and engineers) | ||
Possible Delivery Method(s) |
Design (days) | 1 |
Production (days) | 1 |
Site Prep (days) | 1 |
Delivery (days) | |
Total (days) | 3 |
Amount in Inventory (#) | |
Production Capacity | |
Production Location |