Flexotels Cabins

Flexotels Cabins
December 1, 2020 Charly Ligety

Flexotels (Foldable Container)

Concept Owner / Company: Flexotels BV
Website: www.flexotels.com

Additional URL: Case Study
Contact: sales@flexotels.com

Flexotels – Short Stay Solutions is an innovative manufacturing and rental company of temporary foldable accommodation. Our Flexotels are easy to transport and deploy. With 10 units on one transport, there is a huge logistic advantage. They can be deployed within minutes. Our Comfotel (not quoted below) is also equipped with private toilet and shower.

  • Quoted Total Cost: $9,600
  • Planned Occupancy (1 person/bed): 2 beds
  • Estimated Cost Per Bed: $4,800
  • Quote’s Total Interior Square Footage: 195 sqft
  • Quote Includes # Units: 1 unit
  • Used for Shelter Before: Yes, but only outside the U.S.
  • Readiness: Ready (In Stock)
  • In Stock / Ready to Ship Today: Yes
  • Manufacturer Identified and Available: Yes, Europe-based
  • Setup Speed: <1 week, in stock, 2 hours to set up on-site
  • Setup Difficulty: Low skill (RV, tent)
  • % Built Onsite: <10% – Arrives Ready, Almost All Built/Assembled Off-Site
  • Portability: Semi-Mobile (detachable, minor disassembly)
  • Intended Use of Shelter: Long Term/Permanent (15+ years)

Design

 

Design Advantages
Manufacturer Identified Yes
Used for shelter in the U.S.? Only outside of U.S.
Prior use examples Tomorrowland Festival, Sziget Festival, Wacken Open Air Festival, Olympic Games London, 24H Le Mans, EURO 2000
Prior use comments
Building experience comments
Intended use cases Mobile hotelroom, mobile office, mobile studentroom, quarantaine room, mobile kitchen
R-value (insulation)
Risk Category
Roof Load (PSF) 0
Indoor Clearance Height (ft)
Waterproof? Yes
Professional Engineer Stamp?
Conforms to ICC’s Temporary Structure and Uses Code
Other Structural / Safety Comments
Sustainability / Green Building Certifications?
Materials Used / Made of:
Disassembly / Assembly Comments:
Ideal Mounting Surfaces Soil (Dirt/Grass), Asphalt / Parking Lot
Anchoring Process

Budget

 

Item Cost ($) Notes
Materials $
Labor $
Delivery $
$
$
$
Budget Total $0
Total Per Bed $0
Total Per Unit $0
Add-on Items
Check all items that are not included in your quote (i.e. would need to be quoted by outside party)
List outside vendors needed to execute (including any architects and engineers)
Possible Delivery Method(s)

Timing

Design (days)
Production (days)
Site Prep (days)
Delivery (days)
Total (days) 0
Amount in Inventory (#)
Production Capacity
Production Location
< Prev
Next >