coodo 32
coodo
A 3D-printed modular functional, flexible and mobile living or working space in contemporary design, that can be installed and enjoyed nearly anywhere
Nearly Ready (Prior Use Cases)
$125,000
2 residents / 1 bedroom
$62,500 / resident
Long-Term/Permanent (15+ years)
80 days offsite | 10 days onsite |
A coodo is a functional, flexible and mobile living or working space in contemporary design, that can be installed and enjoyed nearly anywhere. It offers a new vision and dimension to the way we live and work. With the coodo you are not bound to the ground anymore. You have the possibility to live right next to the most beautiful of landscapes or in the center of the biggest metropolises – or both.
- Quoted Total Cost: $125,000
- Planned Occupancy (1 person/bed): 2 beds
- Estimated Cost Per Bed: $62,500
- Quote’s Total Interior Square Footage: 322 sqft
- Quote Includes # Units: 1 units
- Used for Shelter Before: Yes, but only outside the U.S.
- Readiness: Nearly Ready (Prior Use Cases)
- In Stock / Ready to Ship Today: No
- Manufacturer Identified and Available: N/A
- Setup Speed: <90 days
- Setup Difficulty: Moderate (prefab assembly)
- % Built Onsite: <10% – Arrives Ready, Almost All Built/Assembled Off-Site
- Portability: Semi-Mobile (detachable, minor disassembly)
- Intended Use of Shelter: Long Term/Permanent (15+ years) years
Used for shelter before? | Yes |
Manufacturer Identified and Available? | Yes |
If so, list examples | |
Prior use comments | |
Building experience comments | |
Intended use cases | |
R-value (insulation) | |
Risk Category | |
Roof Load (PSF) | |
Indoor Clearance Height (ft) | |
Waterproof? | |
Professional Engineer Stamp? | |
Conforms to ICC’s Temporary Structure and Uses Code | |
Other Structural / Safety Comments | |
Sustainability / Green Building Certifications? | |
Materials Used / Made of: | |
Disassembly / Assembly Comments: | |
Ideal Mounting Surfaces | |
Anchoring Process |
Item | Cost ($) | Notes |
Materials | $ | |
Labor | $ | |
Delivery | $ | |
$ | ||
$ | ||
$ | ||
Budget Total | $0 | |
Total Per Bed | $0 | |
Total Per Unit | $0 | |
Add-on Items | ||
Check all items that are not included in your quote (i.e. would need to be quoted by outside party) | ||
List outside vendors needed to execute (including any architects and engineers) | ||
Possible Delivery Method(s) |
Design (days) | |
Production (days) | |
Site Prep (days) | |
Delivery (days) | |
Total (days) | <90 days |
Amount in Inventory (#) | |
Production Capacity | |
Production Location |