coodo 32

coodo 32
June 4, 2020 Charly Ligety

coodo 32

Concept Owner / Company: LTG Lofts to go Holding Limited
Website: www.coodo.com
Contact: info@loftstogo.com

A coodo is a functional, flexible and mobile living or working space in contemporary design, that can be installed and enjoyed nearly anywhere and anyplace. It offers a new vision and dimension to the way we live and work. With the coodo you are not bound to the ground anymore. You have the possibility to live right next to the most beautiful of landscapes or in the center of the biggest metropolises – or both.

  • Quoted Total Cost: $125,000
  • Planned Occupancy (1 person/bed): 2 beds
  • Estimated Cost Per Bed: $62,500
  • Quote’s Total Interior Square Footage: 322 sqft
  • Quote Includes # Units: 1 units
  • Used for Shelter Before: Yes, but only outside the U.S.
  • Readiness: Nearly Ready (Prior Use Cases)
  • In Stock / Ready to Ship Today: No
  • Manufacturer Identified and Available: N/A
  • Setup Speed: <90 days
  • Setup Difficulty: Moderate (prefab assembly)
  • % Built Onsite: <10% – Arrives Ready, Almost All Built/Assembled Off-Site
  • Portability: Semi-Mobile (detachable, minor disassembly)
  • Intended Use of Shelter: Long Term/Permanent (15+ years) years

Design

Used for shelter before? Yes
Manufacturer Identified and Available? Yes
If so, list examples
Prior use comments
Building experience comments
Intended use cases
R-value (insulation)
Risk Category
Roof Load (PSF)
Indoor Clearance Height (ft)
Waterproof?
Professional Engineer Stamp?
Conforms to ICC’s Temporary Structure and Uses Code
Other Structural / Safety Comments
Sustainability / Green Building Certifications?
Materials Used / Made of:
Disassembly / Assembly Comments:
Ideal Mounting Surfaces
Anchoring Process

Budget

 

Item Cost ($) Notes
Materials $
Labor $
Delivery $
$
$
$
Budget Total $0
Total Per Bed $0
Total Per Unit $0
Add-on Items
Check all items that are not included in your quote (i.e. would need to be quoted by outside party)
List outside vendors needed to execute (including any architects and engineers)
Possible Delivery Method(s)

Timing

Design (days)
Production (days)
Site Prep (days)
Delivery (days)
Total (days) <90 days
Amount in Inventory (#)
Production Capacity
Production Location
< Prev
Next >