Emergency Quarantine Facility
WTA Design Studio
A simple, practical solution prioritizing speed and scalability for minimal cost, manpower, and equipment, made with local, readily-available materials.
Ready (In Stock)
$15,000
16 residents / 1 facility
$938 / resident
Medium Term (1-10 years)
| 1 days offsite | 5 days onsite |
The Emergency Quarantine Facility (EQF) is a facility that is meant to address our housing needs with the simplest and most practical solutions. It prioritizes speed and scalability and minimizes cost and manpower and equipment.
- Quoted Total Cost: $15000
- Planned Occupancy (1 person/bed): 16 beds
- Estimated Cost Per Bed: $938
- Quote’s Total Interior Square Footage: 1,600 sqft
- Quote Includes # Units: 1 units
- Used for Shelter Before: Yes, but only outside the U.S.
- Readiness: Ready (In Stock)
- In Stock / Ready to Ship Today: Yes
- Manufacturer Identified and Available: N/A
- Setup Speed: 6 days
- Setup Difficulty: Moderate (prefab assembly)
- % Built Onsite: >75% – Majority of Structure Assembled and/or Built On-Site
- Portability: Not intended to be moved
- Intended Use of Shelter: Medium Term (1-10 years)
| Used for shelter before? | Yes |
| Used for shelter in the U.S.? | Yes |
| If so, list examples | emergency quarantine facility. housing for healthcare workers, housing for factory workers, housing for migrant workers in Singapore. |
| Prior use comments | 3000 beds in the Philippines and 4000 beds in Singapore. |
| Building experience comments | |
| Intended use cases | |
| R-value (insulation) | |
| Risk Category | |
| Roof Load (PSF) | 0 |
| Indoor Clearance Height (ft) | 8 |
| Waterproof? | Yes |
| Professional Engineer Stamp? | |
| Conforms to ICC’s Temporary Structure and Uses Code | |
| Other Structural/Safety Comments | |
| Sustainability/Green Building Certifications? | |
| Materials Used/Made of: | Wood framing PE sheets shipping pallets metal roofing sheet |
| Disassembly/Assembly Comments: | |
| Ideal Mounting Surfaces | Soil (Dirt/Grass), Asphalt / Parking Lot |
| Anchoring Process |
| Item | Cost ($) | Notes |
| Materials | $ | |
| Labor | $ | |
| Delivery | $ | |
| $ | ||
| $ | ||
| $ | ||
| Budget Total | $0 | |
| Total Per Bed | $0 | |
| Total Per Unit | $0 | |
| Add-on Items | ||
| Check all items that are not included in your quote (i.e. would need to be quoted by outside party) | ||
| List outside vendors needed to execute (including any architects and engineers) | ||
| Possible Delivery Method(s) | ||
| Earliest On-site Opening Date | [earliest_date] |
| Design (days) | 0 |
| Production (days) | 0 |
| Site Prep (days) | 5 |
| Delivery (days) | 1 |
| Total (days) | 6 |
| Amount in Inventory (#) | |
| Production Capacity | |
| Production Location |