Emergency Quarantine Facility by WTA Design Studio

Emergency Quarantine Facility by WTA Design Studio
May 31, 2020 Charly Ligety

Emergency Quarantine Facility

Concept Owner / Company: WTA Architecture and Design Studio
Website: http://www.wtadesignstudio.com/eqf/
Contact: william.ti@wtadesignstudio.com

The Emergency Quarantine Facility (EQF) is a facility that is meant to address our housing needs with the simplest and most practical solutions. It prioritizes speed and scalability and minimizes cost and manpower and equipment.

  • Quoted Total Cost: $15000
  • Planned Occupancy (1 person/bed): 16 beds
  • Estimated Cost Per Bed: $938
  • Quote’s Total Interior Square Footage: 1,600 sqft
  • Quote Includes # Units: 1 units
  • Used for Shelter Before: Yes, but only outside the U.S.
  • Readiness: Ready (In Stock)
  • In Stock / Ready to Ship Today: Yes
  • Manufacturer Identified and Available: N/A
  • Setup Speed: 6 days
  • Setup Difficulty: Moderate (prefab assembly)
  • % Built Onsite: >75% – Majority of Structure Assembled and/or Built On-Site
  • Portability: Not intended to be moved
  • Intended Use of Shelter: Medium Term (1-10 years)

Design

Used for shelter before? Yes
Used for shelter in the U.S.? Yes
If so, list examples emergency quarantine facility. housing for healthcare workers, housing for factory workers, housing for migrant workers in Singapore.
Prior use comments 3000 beds in the Philippines and 4000 beds in Singapore.
Building experience comments
Intended use cases
R-value (insulation)
Risk Category
Roof Load (PSF) 0
Indoor Clearance Height (ft) 8
Waterproof? Yes
Professional Engineer Stamp?
Conforms to ICC’s Temporary Structure and Uses Code
Other Structural/Safety Comments
Sustainability/Green Building Certifications?
Materials Used/Made of: Wood framing PE sheets shipping pallets metal roofing sheet
Disassembly/Assembly Comments:
Ideal Mounting Surfaces Soil (Dirt/Grass), Asphalt / Parking Lot
Anchoring Process

Budget

 

Item Cost ($) Notes
Materials $
Labor $
Delivery $
$
$
$
Budget Total $0
Total Per Bed $0
Total Per Unit $0
Add-on Items
Check all items that are not included in your quote (i.e. would need to be quoted by outside party)
List outside vendors needed to execute (including any architects and engineers)
Possible Delivery Method(s)

Timing

Earliest On-site Opening Date [earliest_date]
Design (days) 0
Production (days) 0
Site Prep (days) 5
Delivery (days) 1
Total (days) 6
Amount in Inventory (#)
Production Capacity
Production Location