Ecocapsule
Ecocapsule Holding
A smart, self-sustainable micro-unit, utilizing solar and wind energy for off-grid accommodation in remote locations while maintaining a high level of comfort...
Ready (In Stock)
$96,611
2 residents / 1 unit
$48,304 / resident
Long-Term/Permanent (15+ years)
45 days offsite | 1 days onsite |
Ecocapsule – smart, self-sustainable micro-unit, which utilizes solar and wind energy, allows an off-grid accommodation in remote locations while maintaining a high level of comfort.
- Quoted Total Cost: $96,611
- Planned Occupancy (1 person/bed): 2 beds
- Estimated Cost Per Bed: $48,306
- Quote’s Total Interior Square Footage: 67.81 sqft
- Quote Includes # Units: 1 unit
- Used for Shelter Before: Yes, Outside U.S. Only
- Readiness: Ready (In Stock)
- In Stock / Ready to Ship Today: No
- Manufacturer Identified and Available: N/A
- Setup Speed: <90 days
- Setup Difficulty: Low skill (RV, tent)
- % Built Onsite: <10% – Arrives Ready, Almost All Built/Assembled Off-Site
- Portability: Semi-Mobile (detachable, minor disassembly)
- Intended Use of Shelter: Long Term/Permanent (15+ years)
Design Advantages | The unique giant egg-like design minimizes energy losses while also maximises the rainwater collection which is then filtered into clean water. |
Manufacturer Identified | Yes |
Used for shelter in the U.S.? | No |
Prior use examples | |
Prior use comments | |
Building experience comments | |
Intended use cases | Ecocapsule can be customized according to customer needs. e.g. home office, beauty salon, guest room, medical purposes, wellness… |
R-value (insulation) | |
Risk Category | |
Roof Load (PSF) | 0 |
Indoor Clearance Height (ft) | |
Waterproof? | Yes |
Professional Engineer Stamp? | |
Conforms to ICC’s Temporary Structure and Uses Code | |
Other Structural / Safety Comments | |
Sustainability / Green Building Certifications? | |
Materials Used / Made of: | The framework is made from steel, the shell from fiberglass (polyester, 0.15 inch thin), and the flooring is a durable PVC. |
Disassembly / Assembly Comments: | |
Ideal Mounting Surfaces | |
Anchoring Process |
Item | Cost ($) | Notes |
Materials | $ | |
Labor | $ | |
Delivery | $ | |
$ | ||
$ | ||
$ | ||
Budget Total | $0 | |
Total Per Bed | $0 | |
Total Per Unit | $0 | |
Add-on Items | ||
Check all items that are not included in your quote (i.e. would need to be quoted by outside party) | ||
List outside vendors needed to execute (including any architects and engineers) | ||
Possible Delivery Method(s) |
Design (days) | |
Production (days) | |
Site Prep (days) | |
Delivery (days) | |
Total (days) | 0 |
Amount in Inventory (#) | |
Production Capacity | |
Production Location |