The Unacle
Unacle
The UNACLE is a stunning, temporary, speedy deployable shelter - designed to have several fold down in a truck for wider deployment...
Conceptual Idea Only
$40,000
2 residents / 1 bedroom
$20,000 / resident
Temporary (<6 months)
| 30 days offsite | 1 days onsite |
UNACLE is a stunning, temporary, speedy erection shelter that allows responders to spend less time providing temporary housing and more time providing relief to victims.
Designed to fold several in a truck, simply UN-FOLD the inner core vertically, UN-FOLD the outer shell horizontally, and plug in the port holes for window openings, and Voila!
- Quoted Total Cost: $100,000
- Planned Occupancy (1 person/bed): 2 beds
- Estimated Cost Per Bed: $50,000
- Quote’s Total Interior Square Footage: 152 sqft
- Quote Includes # Units: 1 unit
- Used for Shelter Before: No.
- Readiness: Conceptual Only
- Manufacturer Identified and Available: N/A
- Setup Speed: 5 days (for on-site assembly only)
- Setup Difficulty: Moderate (prefab assembly)
- % Built Onsite: 10%
- Portability: Portable (after major disassembly)
- Intended Use of Shelter: Temporary (<6 months)

| Design Advantages | N/A |
| Manufacturer Identified | No |
| Used for shelter in the U.S.? | No |
| Prior use examples | No |
| Prior use comments | None. |
| Building experience comments | Not reported |
| Intended use cases | |
| R-value (insulation) | |
| Risk Category | |
| Roof Load (PSF) | 0 |
| Indoor Clearance Height (ft) | |
| Waterproof? | Yes |
| Professional Engineer Stamp? | |
| Conforms to ICC’s Temporary Structure and Uses Code | |
| Other Structural / Safety Comments | |
| Sustainability / Green Building Certifications? | |
| Materials Used / Made of: | |
| Disassembly / Assembly Comments: | |
| Ideal Mounting Surfaces | |
| Anchoring Process |
| Item | Cost ($) | Notes |
| Materials | $ | |
| Labor | $ | |
| Delivery | $ | |
| $ | ||
| $ | ||
| $ | ||
| Budget Total | $0 | |
| Total Per Bed | $0 | |
| Total Per Unit | $0 | |
| Add-on Items | ||
| Check all items that are not included in your quote (i.e. would need to be quoted by outside party) | ||
| List outside vendors needed to execute (including any architects and engineers) | ||
| Possible Delivery Method(s) | ||
| Design (days) | |
| Production (days) | |
| Site Prep (days) | |
| Delivery (days) | |
| Total (days) | 0 |
| Amount in Inventory (#) | |
| Production Capacity | |
| Production Location |









NEXT



