gg

The Unacle

  • The Unacle Housing Innovation Collaborative
  • Housing Innovation Collaborative
  • The Unacle Housing Innovation Collaborative
  • Housing Innovation Collaborative
  • Housing Innovation Collaborative
View
Ask

Plans & Renderings

The Unacle

Unacle

The UNACLE is a stunning, temporary, speedy deployable shelter - designed to have several fold down in a truck for wider deployment...

Conceptual Idea Only

$40,000

2 residents / 1 bedroom

$20,000 / resident

Temporary (<6 months)

30 days offsite 1 days onsite

UNACLE is a stunning, temporary, speedy erection shelter that allows responders to spend less time providing temporary housing and more time providing relief to victims.
Designed to fold several in a truck, simply UN-FOLD the inner core vertically, UN-FOLD the outer shell horizontally, and plug in the port holes for window openings, and Voila!

  • Quoted Total Cost: $100,000
  • Planned Occupancy (1 person/bed): 2 beds
  • Estimated Cost Per Bed: $50,000
  • Quote’s Total Interior Square Footage: 152 sqft
  • Quote Includes # Units: 1 unit
  • Used for Shelter Before: No.
  • Readiness: Conceptual Only
  • Manufacturer Identified and Available: N/A
  • Setup Speed: 5 days (for on-site assembly only)
  • Setup Difficulty: Moderate (prefab assembly)
  • % Built Onsite: 10%
  • Portability: Portable (after major disassembly)
  • Intended Use of Shelter: Temporary (<6 months)

 

The Unacle Housing Innovation Collaborative

 

Design Advantages N/A
Manufacturer Identified No
Used for shelter in the U.S.? No
Prior use examples No
Prior use comments None.
Building experience comments Not reported
Intended use cases
R-value (insulation)
Risk Category
Roof Load (PSF) 0
Indoor Clearance Height (ft)
Waterproof? Yes
Professional Engineer Stamp?
Conforms to ICC’s Temporary Structure and Uses Code
Other Structural / Safety Comments
Sustainability / Green Building Certifications?
Materials Used / Made of:
Disassembly / Assembly Comments:
Ideal Mounting Surfaces
Anchoring Process
Item Cost ($) Notes
Materials $
Labor $
Delivery $
$
$
$
Budget Total $0
Total Per Bed $0
Total Per Unit $0
Add-on Items
Check all items that are not included in your quote (i.e. would need to be quoted by outside party)
List outside vendors needed to execute (including any architects and engineers)
Possible Delivery Method(s)
Design (days)
Production (days)
Site Prep (days)
Delivery (days)
Total (days) 0
Amount in Inventory (#)
Production Capacity
Production Location

Ask a Question

Visit Website