The OPod
Homed
The OPOD by Homed is micro-unit made of reinvented concrete culverts, fitted with conduits, flexible furniture, kitchen, bathroom, and a bed.
Built Prototype Only
$20,000
1 resident / 1 unit
$20,000 / resident
Medium Term (1-10 years)
90 days offsite | 1 days onsite |
- Quoted Total Cost: $20,000
- Planned Occupancy (1 person/bed): 1 bed
- Estimated Cost Per Bed: $20,000
- Quote’s Total Interior Square Footage: 100 sqft
- Quote Includes # Units: 1 unit
- Used for Shelter Before: Not used as shelter yet
- Readiness: Prototype Stage
- In Stock / Ready to Ship Today: No
- Manufacturer Identified and Available: N/A
- Setup Speed: <90 days
- Setup Difficulty: Medium skill
- % Built Onsite: <10% – Arrives Ready, Almost All Built/Assembled Off-Site
- Portability: Semi-Mobile
- Intended Use of Shelter: Medium Term (1-10 Years)
Design Advantages | Made of concrete culverts, usually used in the piping infrastructure projects. |
Manufacturer Identified | Yes |
Used for shelter in the U.S.? | Not yet |
Prior use examples | Designed for micro-living units in higher density urban settings. |
Prior use comments | |
Building experience comments | |
Intended use cases | |
R-value (insulation) | |
Risk Category | |
Roof Load (PSF) | 0 |
Indoor Clearance Height (ft) | |
Waterproof? | |
Professional Engineer Stamp? | |
Conforms to ICC’s Temporary Structure and Uses Code | |
Other Structural / Safety Comments | |
Sustainability / Green Building Certifications? | |
Materials Used / Made of: | |
Disassembly / Assembly Comments: | |
Ideal Mounting Surfaces | |
Anchoring Process |
Item | Cost ($) | Notes |
Materials | $ | |
Labor | $ | |
Delivery | $ | |
$ | ||
$ | ||
$ | ||
Budget Total | $0 | |
Total Per Bed | $0 | |
Total Per Unit | $0 | |
Add-on Items | ||
Check all items that are not included in your quote (i.e. would need to be quoted by outside party) | Foundation work, Electrical distribution, Delivery Charge | |
List outside vendors needed to execute (including any architects and engineers) | ||
Possible Delivery Method(s) | Regular-sized trailer |
Design (days) | 0 |
Production (days) | 30 |
Site Prep (days) | 30 |
Delivery (days) | 3 |
Total (days) | 63 |
Amount in Inventory (#) | |
Production Capacity | |
Production Location |