The OPod

Homed

The OPOD by Homed is micro-unit made of reinvented concrete culverts, fitted with conduits, flexible furniture, kitchen, bathroom, and a bed.

Built Prototype Only

$20,000

1 resident / 1 unit

$20,000 / resident

Medium Term (1-10 years)

90 days offsite 1 days onsite
  • Quoted Total Cost: $20,000
  • Planned Occupancy (1 person/bed): 1 bed
  • Estimated Cost Per Bed: $20,000
  • Quote’s Total Interior Square Footage: 100 sqft
  • Quote Includes # Units: 1 unit
  • Used for Shelter Before: Not used as shelter yet
  • Readiness: Prototype Stage
  • In Stock / Ready to Ship Today: No
  • Manufacturer Identified and Available: N/A
  • Setup Speed: <90 days
  • Setup Difficulty: Medium skill
  • % Built Onsite: <10% – Arrives Ready, Almost All Built/Assembled Off-Site
  • Portability: Semi-Mobile
  • Intended Use of Shelter: Medium Term (1-10 Years)
Design Advantages Made of concrete culverts, usually used in the piping infrastructure projects.
Manufacturer Identified Yes
Used for shelter in the U.S.? Not yet
Prior use examples Designed for micro-living units in higher density urban settings.
Prior use comments
Building experience comments
Intended use cases
R-value (insulation)
Risk Category
Roof Load (PSF) 0
Indoor Clearance Height (ft)
Waterproof?
Professional Engineer Stamp?
Conforms to ICC’s Temporary Structure and Uses Code
Other Structural / Safety Comments
Sustainability / Green Building Certifications?
Materials Used / Made of:
Disassembly / Assembly Comments:
Ideal Mounting Surfaces
Anchoring Process
Item Cost ($) Notes
Materials $
Labor $
Delivery $
$
$
$
Budget Total $0
Total Per Bed $0
Total Per Unit $0
Add-on Items
Check all items that are not included in your quote (i.e. would need to be quoted by outside party) Foundation work, Electrical distribution, Delivery Charge
List outside vendors needed to execute (including any architects and engineers)
Possible Delivery Method(s) Regular-sized trailer
Design (days) 0
Production (days) 30
Site Prep (days) 30
Delivery (days) 3
Total (days) 63