Cubic Construction
William Bridger
A minimalist, portable studio apartment fitting abroad a retrofitted shipping container.
Built Prototype Only
$25,000
1 resident / 1 studio
$25,000 / resident
Long-Term/Permanent (15+ years)
75 days offsite | 1 days onsite |
A minimalist, portable studio apartment fitting abroad a retrofitted shipping container.
- Quoted Total Cost: $25,000
- Planned Occupancy (1 person/bed): 1 beds
- Estimated Cost Per Bed: $25,000
- Quote’s Total Interior Square Footage: 160 sqft
- Quote Includes # Units: 1 units
- Used for Shelter Before: Not used as shelter yet
- Readiness: Built Prototype Only
- In Stock / Ready to Ship Today: No
- Manufacturer Identified and Available: N/A
- Setup Speed: <90 days
- Setup Difficulty: Low skill (RV, tent)
- % Built Onsite: <10% – Arrives Ready, Almost All Built/Assembled Off-Site
- Portability: Semi-mobile
- Intended Use of Shelter: Longer Term (15+ years)
Used for shelter before? | No |
Manufacturer Identified? | No |
Shelter examples: | |
Prior use comments | Currently a model home in Las Vegas |
Building experience comments | |
Intended use cases | Backyard Studio, Homeless Housing |
R-value (insulation) | 41-50 |
Risk Category | I |
Roof Load (PSF) | 0 |
Indoor Clearance Height (ft) | |
Waterproof? | Yes |
Professional Engineer Stamp? | |
Conforms to ICC’s Temporary Structure and Uses Code | |
Other Structural / Safety Comments | |
Sustainability / Green Building Certifications? | |
Materials Used / Made of: | Lightweight steel Metal Sandwich Panel Fibercement pontoon |
Disassembly / Assembly Comments: | |
Ideal Mounting Surfaces | Other |
Anchoring Process | Any surface |
Item | Cost ($) | Notes |
Materials | $ | |
Labor | $ | |
Delivery | $ | |
$ | ||
$ | ||
$ | ||
Budget Total | $0 | |
Total Per Bed | $0 | |
Total Per Unit | $0 | |
Add-on Items | ||
Check all items that are not included in your quote (i.e. would need to be quoted by outside party) | ||
List outside vendors needed to execute (including any architects and engineers) | ||
Possible Delivery Method(s) |
Design (days) | 77 |
Production (days) | 10 |
Site Prep (days) | 1 |
Delivery (days) | 1 |
Total (days) | 90 |
Amount in Inventory (#) | |
Production Capacity | |
Production Location | Los Angeles, CA |