gg

Cubic Construction

  • Cubic Construction Bill 1 Housing Innovation Collaborative
  • Cubic Construction Img 099011 1 Housing Innovation Collaborative
  • Cubic Construction Img 10161 1 Housing Innovation Collaborative
  • Cubic Construction Img 098011 1 Housing Innovation Collaborative
  • Cubic Construction Img 10141 1 Housing Innovation Collaborative
  • Cubic Construction Img 10311 1 Housing Innovation Collaborative
View
Ask

Completed Project Images

Cubic Construction

William Bridger

A minimalist, portable studio apartment fitting abroad a retrofitted shipping container.

Built Prototype Only

$25,000

1 resident / 1 studio

$25,000 / resident

Long-Term/Permanent (15+ years)

75 days offsite 1 days onsite

A minimalist, portable studio apartment fitting abroad a retrofitted shipping container.

  • Quoted Total Cost: $25,000
  • Planned Occupancy (1 person/bed): 1 beds
  • Estimated Cost Per Bed: $25,000
  • Quote’s Total Interior Square Footage: 160 sqft
  • Quote Includes # Units: 1 units
  • Used for Shelter Before: Not used as shelter yet
  • Readiness: Built Prototype Only
  • In Stock / Ready to Ship Today: No
  • Manufacturer Identified and Available: N/A
  • Setup Speed: <90 days
  • Setup Difficulty: Low skill (RV, tent)
  • % Built Onsite: <10% – Arrives Ready, Almost All Built/Assembled Off-Site
  • Portability: Semi-mobile
  • Intended Use of Shelter: Longer Term (15+ years)
Used for shelter before? No
Manufacturer Identified? No
Shelter examples:
Prior use comments Currently a model home in Las Vegas
Building experience comments
Intended use cases Backyard Studio, Homeless Housing
R-value (insulation) 41-50
Risk Category I
Roof Load (PSF) 0
Indoor Clearance Height (ft)
Waterproof? Yes
Professional Engineer Stamp?
Conforms to ICC’s Temporary Structure and Uses Code
Other Structural / Safety Comments
Sustainability / Green Building Certifications?
Materials Used / Made of: Lightweight steel
Metal Sandwich Panel
Fibercement pontoon
Disassembly / Assembly Comments:
Ideal Mounting Surfaces Other
Anchoring Process Any surface
Item Cost ($) Notes
Materials $
Labor $
Delivery $
$
$
$
Budget Total $0
Total Per Bed $0
Total Per Unit $0
Add-on Items
Check all items that are not included in your quote (i.e. would need to be quoted by outside party)
List outside vendors needed to execute (including any architects and engineers)
Possible Delivery Method(s)
Design (days) 77
Production (days) 10
Site Prep (days) 1
Delivery (days) 1
Total (days) 90
Amount in Inventory (#)
Production Capacity
Production Location Los Angeles, CA

 

Ask a Question

Visit Website